2004 |
Louis Y.Y. Lu and Chyan Yang, “The R&D and Marketing Cooperation across new product development stages: An Empirical Study of Taiwanese IT Industry,”, Industrial Marketing Management, vol. 33, 7, pp. 593-605, 2004 |
2004 |
Louis Y.Y. Lu, Shiu-Wan Hung, and Chyan Yang, “Successful Factors of Integrated Circuits Fabless Industries in Taiwan,”, International Journal of Manufacturing Technology and Management, vol. 6, 1/2, pp. 98-111, 2004 |
2004 |
Chyan Yang and Shiu-Wan Hung, “Optimising the thermo-forming process of polymeric foams by Using the Taguchi Method and the Utility Concept,”, International Journal of Advanced Manufacturing and Technology, vol. 23, 1, pp. 109-121, 2004 |
2004 |
Chyan Yang and Hong-Shiang Jiang, “APC Matrix: a framework for platform strategy,”, International Journal of Manufacturing Technology and Management, vol. 6, 1/2, pp. 9-24, 2004 |
2004 |
Jen-Hung Huang, Chyan Yang, Bihuang Jin, “Satisfaction with Business-to-Employee Benefit Systems and Organizational Citizenship Behaviors,”, International Journal of Manpower, vol. 25, 2, pp. 195-210, 2004 |
2004 |
Shiu-Wan Hung, Chyan Yang and Cheng-Few Lee, “Vertical Disintegration of Taiwan’s Semiconductor Industries: Price and Non-price Factors,”, Review of Pacific Basin Financial Markets and Policies, vol. 7, 4, pp. 547-569, 2004 |
2004 |
林蒼祥、謝文良、段昌文、李宗培 , The Design of an Index Futures Contract: A Case Study on the Taiwan 50 Futures, Asia Pacific Review of Social Science and Technology, vol. 3, 2, pp. 1-17, 2004 |
2004 |
Hsing-Hua Huang, Joseph J. C. Lyu, Szu-Lang Liao, Bonds Valuation and Agency Problems-A Contingent Claims Approach under Optimal Capital Structure , Securities Analysts Association Journal, vol. 20, pp. 47-61, 2004 |
2004 |
S.J. Shyu, B.M.T. Lin and P.Y. Yin, Applications of ant colony optimization for no-wait flowshop scheduling to minimize the total completion time, Computers & Industrial Engineering, 2004 |
2004 |
B.M.T. Lin and A.A.K Jeng, Parallel-machine batch scheduling to minimize the maximum lateness and the number of tardy jobs, International Journal of Production Economics, 2004 |