1997 |
C. Oguz, B.M.T. Lin and T.C.E. Cheng, Two-stage flowshop scheduling problem with a common second-stage machine, Computers & Operations Research, 1997 |
1997 |
S.S. Tseng, B.M.T. Lin and S.H. Liu, Constructing Ng Latin squares for g , Journal of Information Science and Engineering, 1997 |
1997 |
T.C.E. Cheng, M.Y. Kovalyov and B.M.T. Lin, Single machine scheduling to minimize the batch delivery and job earliness penalty, SIAM Journal on Optimization, 1997 |
1997 |
黎漢林,夏莉芬, 中國的進諫藝術 – 以HIC及PAC理論解析, Historical Monthly, 1997 |
1997 |
黎漢林,徐開平, 空間配置規則之推導, Journal of Architecture, vol. 23, 1997 |
1997 |
黎漢林,夏莉芬, 中國的進諫藝術 – 以HIC及PAC理論解析, Historical Monthly, 1997 |
1997 |
黎漢林,徐開平, 空間配置規則之推導, Journal of Architecture, vol. 23, 1997 |
1996 |
楊 千,陳文典, “應用時間變動的創新方程式估計耐久性產品需求函數:以台灣地區外銷網路卡為例”, 交大管理學報, vol. 16, pp. 121-135, 1996 |
1996 |
T.C.E. Cheng, Z.L. Chen, M.Y. Kovalyov and B.M.T. Lin, Parallel-machine batching and scheduling to minimize total completion time, IIE Transactions, 1996 |
1996 |
黎漢林, 以習性, 資訊, 能力解析決策案例 – 何以韓信能而馬謖不能, Management Information System, 8, 1996 |