1997 |
C. Oguz, B.M.T. Lin and T.C.E. Cheng, Two-stage flowshop scheduling problem with a common second-stage machine, Computers & Operations Research, 1997 |
1997 |
S.S. Tseng, B.M.T. Lin and S.H. Liu, Constructing Ng Latin squares for g , Journal of Information Science and Engineering, 1997 |
1997 |
T.C.E. Cheng, M.Y. Kovalyov and B.M.T. Lin, Single machine scheduling to minimize the batch delivery and job earliness penalty, SIAM Journal on Optimization, 1997 |
1997 |
黎汉林,夏莉芬, 中国的进谏艺术 – 以HIC及PAC理论解析, 历史月刊, 1997 |
1997 |
黎汉林,徐开平, 空间配置规则之推导, 建筑学报, vol. 23, 1997 |
1997 |
黎汉林,夏莉芬, 中国的进谏艺术 – 以HIC及PAC理论解析, 历史月刊, 1997 |
1997 |
黎汉林,徐开平, 空间配置规则之推导, 建筑学报, vol. 23, 1997 |
1996 |
杨 千,陈文典, “应用时间变动的创新方程式估计耐久性产品需求函数:以台湾地区外销网络卡为例”, 交大管理学报, vol. 16, pp. 121-135, 1996 |
1996 |
T.C.E. Cheng, Z.L. Chen, M.Y. Kovalyov and B.M.T. Lin, Parallel-machine batching and scheduling to minimize total completion time, IIE Transactions, 1996 |
1996 |
黎汉林, 以习性, 资讯, 能力解析决策案例 – 何以韩信能而马谡不能, 管理信息系统, 8, 1996 |